PROJECT Updates

Joint allocation of a laboratory at CEMINEM 1 with the MECANOS Group (UNIZAR)

The joint allocation of a laboratory in CEMINEM 1, shared with the MECANOS Group, is a milestone that deepens collaboration between the business and academic sides of the project. This shared space becomes a direct bridge between Dual Cycle and one of the key research...

Allocation of a laboratory at the Veterinary Campus (UNIZAR)

The allocation of a laboratory at the University of Zaragoza’s Veterinary Campus is another key step in the scientific development of heliCO2farm. This space provides a fully equipped environment for biological and biomineralization tests linked to our CO₂ capture...

Completion of the first experimental habitat assembly with integrated IoT (ITAINNOVA)

Completion of the first experimental habitat assembly with integrated IoT is one of the most eagerly awaited milestones in the heliCO2farm trajectory. It marks the transition from design and planning to the tangible reality of an operational system ready for testing....
Allocation of a laboratory at the Veterinary Campus (UNIZAR)

Allocation of a laboratory at the Veterinary Campus (UNIZAR)

The allocation of a laboratory at the University of Zaragoza’s Veterinary Campus is another key step in the scientific development of heliCO2farm. This space provides a fully equipped environment for biological and biomineralization tests linked to our CO₂ capture...

R&D contract signed with the MECANOS Group (UNIZAR)

R&D contract signed with the MECANOS Group (UNIZAR)

The R&D contract with the “Membranes and Catalysis with Nanostructures” (MECANOS) group at the University of Zaragoza is a foundational milestone in the nanotechnology dimension of heliCO2farm. This group brings top‑tier expertise in membranes, advanced materials,...

Hiring of DUAL CYCLE’s first employee

Hiring of DUAL CYCLE’s first employee

The hiring of DUAL CYCLE’s first employee marks the transition from a purely founding team to a growing organization. This milestone is especially symbolic for any startup, as it shows that the project is gaining enough traction to expand the team. It also represents...